Sets the terms for a main contractor passing part of the building works to a sub-contractor: scope, price, programme, payment, defects and how it fits with the main contract.
New here? Signing in creates your account. No password, we email you a link. You pay only after you have seen the outline of your agreement.
A main contractor hiring a sub-contractor for part of a building project, and the sub-contractor doing that part.
Inside the agreement
These are the questions you will be asked. Having the answers to hand makes it quick, and you can save and come back at any time.
55 questions in 15 sections. Questions marked Optional or If it applies may not need an answer.
A date
The contractor that holds the main contract and is hiring the Sub-Contractor. As registered with SSM, or as on the NRIC for an individual.
The registered or business address. Notices are sent here.
As registered with SSM, or as on the NRIC for an individual.
The registered or business address. Notices are sent here.
Choose one
Options: Neither party may end this Agreement without a reason. · The Main Contractor may end this Agreement without a reason, as this Agreement provides. The Sub-Contractor has no such right. · Either party may end this Agreement without a reason, as this Agreement provides.
Many sub-contracts let the Main Contractor do so, on paying for the work done and the Sub-Contractor’s costs of leaving the Site. Letting the Sub-Contractor do so means it may leave part-way through its works. Any answer other than no adds a notice clause.
Choose one
Options: G1 · G2 · G3 · G4 · G5 · G6 +1 more
Grades run from G1 (the smallest projects) to G7 (no limit). The grade must allow works of the value of the Sub-Contract Sum.
As shown on the Sub-Contractor’s CIDB certificate of registration. Leave it empty to write it in by hand.
A date
The contract between the project owner and the Main Contractor.
Their full legal name. They are not a party to this Agreement.
As stated in the Main Contract, for example “Proposed two-storey shop office on Lot 123”.
The postal address, or the lot number, mukim, and district from the title.
A short, clear description of the trade or package, for example “supply and installation of the electrical works for Block A”. The details go in the drawings and specifications.
A list of items
Each item asks for: Document, Reference or drawing no., Date or revision
In order of priority, for example the specifications and drawings for the Sub-Contract Works, the bills of quantities or schedule of rates, and the Sub-Contractor’s accepted quotation. Leave it empty to list them by hand.
Choose one
Options: No, it builds to the design given to it · Yes, it designs its own works
For example scaffolding, hoists and tower crane, temporary water and electricity at points on the Site, storage space, and welfare facilities. Write “none” if the Sub-Contractor provides its own.
A date
A date
This is the Sub-Contract Completion Date. Leave enough time for the Main Contractor to finish by the completion date in the Main Contract.
A number
Make it shorter than the notice period in the Main Contract, so the Main Contractor can pass the notice on in time. 7 to 14 days is common.
An amount in RM
Base it on the Main Contractor’s likely loss from each day of delay, including the liquidated damages it may have to pay the Employer and its own extra site costs. An amount far above the likely loss may not be enforceable.
An amount in RM
The agreed lump-sum price for the whole of the Sub-Contract Works, before any Variations.
Choose one
Options: shall give the Main Contractor a performance bond, as this Agreement provides · is not required by this Agreement to give a performance bond
A bank guarantee or insurance bond the Main Contractor can call on if the Sub-Contractor defaults. Yes adds a performance bond clause.
A number
10 to 14 days is common. A payment claim served under CIPAA must still be answered within the 10 working days CIPAA allows.
A number
5% to 10% is common.
A number
5% is common.
A number
It should end no earlier than the defects liability period in the Main Contract. 12 to 24 months is common.
Choose one
Options: The Main Contractor, under the Project policy · The Sub-Contractor, under its own policy
An amount in RM
Often RM 500,000 to RM 1,000,000 for a sub-contractor, more for high-risk trades.
A number
14 to 30 days is common.
A number
14 to 30 days is common.
A number
Choose one
Options: The courts of Malaysia · Arbitration at the AIAC in Kuala Lumpur
Choose one
Options: the Main Contractor · the Sub-Contractor · the Main Contractor and the Sub-Contractor in equal shares
Agree this with the other party. In many sub-contracts the Sub-Contractor pays.
Choose one
Options: A Malaysian company (Sdn Bhd, Bhd or company limited by guarantee) · A limited liability partnership (PLT) · A sole proprietor (enterprise) · A partnership (firm) · An individual · A company or organisation outside Malaysia +1 more
This decides how it signs the agreement.
Choose one
Options: Two authorised officers, at least one a director (recommended) · One director, because the company has only one director (needs a witness) · The company's common seal
Not sure? Choose two authorised officers. It is the safest way for a company to sign.
Leave blank to write it in by hand when signing.
Nothing to pay until you have seen your outline.
A number
10% is common.
A number
30 to 45 days is common. Payment cannot be made to depend on the Main Contractor being paid by the Employer.
A number
Keep it reasonable. Many agreements use 5% to 8% a year.
A number
5% is common.
For example Director or Partner. Leave blank to write it in by hand when signing.
Leave blank to write it in by hand when signing.
Leave blank to write it in by hand when signing.
For example Director or Company Secretary. Leave blank to write it in by hand when signing.
Leave blank to write it in by hand when signing.
Choose one
Options: A Malaysian company (Sdn Bhd, Bhd or company limited by guarantee) · A limited liability partnership (PLT) · A sole proprietor (enterprise) · A partnership (firm) · An individual · A company or organisation outside Malaysia +1 more
This decides how it signs the agreement.
Choose one
Options: Two authorised officers, at least one a director (recommended) · One director, because the company has only one director (needs a witness) · The company's common seal
Not sure? Choose two authorised officers. It is the safest way for a company to sign.
Leave blank to write it in by hand when signing.
For example Director or Partner. Leave blank to write it in by hand when signing.
Leave blank to write it in by hand when signing.
Leave blank to write it in by hand when signing.
For example Director or Company Secretary. Leave blank to write it in by hand when signing.
Leave blank to write it in by hand when signing.